A substantial facility, spanning four floors and boasting a load-bearing capacity of 1000 kilograms per square meter, was meticulously executed by GrandA Engineering. The construction strictly adhered to the guidelines provided by the Chinese manufacturer and was successfully concluded within a working period of 5 months.